COMPLETE BATHROOM RENOVATIONS

What We Do

SDC10034 SDC10056

DAY ONE

PHASE ONE

We completely remove and dispose of the old bathtub. Even a cast iron bathtub or a one piece unit can be out with in an hour or so. We completely remove the wall system and walls down to the studs. Remove the old plumbing and valve.

PHASE TWO

Start trading

Install new plumbing and MOEN pressure balance valve. Install new VIKRELL bathtub and wall system that NEVER require CAULKING anywhere

PHASE THREE

Install a modern Moen trim IVA or BRANDFORT Start drywall repair.

AT THE END OF DAY ONE

You can usually use the bathtub

DAY TWO AND THREE

A few hours a day to complete the drywall repair. Primer and MOEN curved shower

rod to be installed